Monday, July 14, 2014

Putting in waste pip for upstairs bathroom

A bridge was put in place so the family could still get in and out the house / annex.
There were lots of signs of rodents when digging under the floors.

This is all now in place and covered up again.

Concrete sub floor

Plastic membrane to keep the floor dry

This is the chute to get the concrete in from the mixer on the drive outside.
 Concrete poured and leveled, this now needs insulation on it, then underfloor heating pipes, then cement screed over the top.

Chimney

After looking at these pictures I realise I don't have many picture of the inside, I will try to take some more this weekend.  The chimney was one of the better buys I have had on this build, it is half the price of a local supplier so I was expecting not great quality but it has turned out to be good! :-)





Rendered other gable

Finally got around to rendering the other gable end with Rich's help