Wayne, of all the solder, push-fit and compression fittings we did to connect up the boiler, only one solder joint leaked. It was one I did this evening to connect up the mains water.
All the plumbing is done now just need to install flue and I will have hot water again :-)
Oh and I need to connect power to it.
No comments:
Post a Comment